A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts

Product Details
Customization: Available
After-sales Service: Tech Service and Parts Supporting
Warranty: 12 Months
Still deciding? Get samples of US$ 800/pcs
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (9)
  • A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts
  • A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts
  • A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts
  • A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts
  • A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts
  • A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts
Find Similar Products

Basic Info.

Model NO.
A10VG45EP4D1/10L-NTC10F045SH
Application
Hoisting Machinery
Certification
CE, ISO9001: 2000
Condition
New
Material
Carbon Steel
Apply for
Hydraulic Pump Motor
Apply to
Excavator
Apply
Paver
Structure
Single Cylinder
Power
Hydraulic
Delivery
After Payment Within 3-5days
Transport Package
Box or Wooden Case
Trademark
PINXIN
Origin
Made in China
HS Code
8431100000
Production Capacity
1000pieces/Month

Packaging & Delivery

Package Size
50.00cm * 50.00cm * 40.00cm
Package Gross Weight
40.000kg

Product Description

Hydralic Pump of Rexroth Hydraulic Pump Parts for Rexroth A10VG Series Constructiom Machinery 
Our Advantage

1.Lots of available Hydraulic parts in stock.
2. We are professional supplier of  hydraulics. have supplying Hydraulic Pump,Hydraulic Motor,Hydraulic Piston Pump&Hydraulic Piston Motor,Gear Pump,Gearbox and wide range of hydraulic parts.
3. Our factory has more than 10 years exprience in hydraulic field .we also  worked with world famous companies like CAT, REXROTH,KOMATSU,EATON,SANY HEAVY INDUSTRY CO., LTD
4.We have fast service of delivery because we have stock.


Real Product Photo
A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare PartsA10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare PartsA10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare PartsA10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare PartsA10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare PartsA10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts










Delivery
A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts

Contact us:
 

 
A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts 
A10vg45ep4d1/10L-Ntc10f045sh for Apply to Bomag Pavers Spare Parts 
 

Packing details:

Eternal Brand, Neutral or Customer's requires packing 

Neutral carton or same as the Customer's requires, export standard carton

All cartons should be packed into the pallets more carefully.

All of the productions are inspected carefully one by one by QC before delivery.

Payment term:

1. T/T: 30% deposit by T/T, 70% balance by T/T before shipment2. L/C at sight

Trade term: EXW or FOB Ningbo/Shanghai

Delivery time:

We have huge quantity of inventory for complete pumps, motor and some spare parts, 
so the leading time is within 3days if have in stock. 
If haven't, within 5days if the quantity is less than 50pcs. 
It depends on the quantity ordered.

Min. Order:
If the model is in common or the production are in our warehouse.
No MOQ for stocking production.Larger quantity, price will be more favorable.

Deliever Way:

By courier, like the DHL, UPS, Fedex,etc. It's door to door or barn to the door,
usually 5-7 days to arrive.

By air to air port, usually 3-5 days arrive.

By sea to sea port, usually 20-30 days arrive.

If your deliever time is very urgent, the best way is by courier or air.

If not, it's beat by sea

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier